The UK’s largest airport, and one of the busiest international airports in the world, London Heathrow, sees over 80 million passengers a year. With ambitious plans for future expansion, and a constant need to enhance safety and operations in their terminals, Heathrow Airport Limited (HAL) and contractor, Mace, have looked to Severn Partnership for support with our leading geospatial solutions. In 2024, Severn Partnership was commissioned by Mace to perform utility mapping and setting out at Terminal 4’s airside area as part of their airside infrastructure improvements on existing baggage roads and walkways.

 

The challenge:

Complex and time-consuming systems threatened to slow down the process despite the need for rapid and accurate survey outputs:

• Highly strict regulation and requirement for all personnel to hold airside security clearance

• Lack of existing reliable survey control

• Multiple contractors involved which required coordination

 

Severn Partnership surveyors working airside at an airport

What we did:

We mobilised quickly with pre-cleared, security-trained personnel:

  • We streamlined survey work approvals by training on-site supervisors so that we could obtain Heathrow work permits directly
  • We gained logistical support from our sister company, Guardior, for airside access and safety compliance including Airside Operator Licence (AOL) signatory status
  • We maintained close collaboration with civil contractors and logistics teams through weekly coordination meetings

 

We used our in-house capability for both utility mapping and setting out, ensuring continuity and accuracy:

  • Data capture using Total Station and Ground Penetrating Radar (GPR) technology
  • Lifting and recording of existing manholes
  • Establishment of a full and robust control network across the site tied to official HAL grid
  • Traditional EML utility tracing techniques
  • Enhanced data security and storage protocols

 

Testimonial:

I was pleased with the high-level performance of Severn Partnership, our new supplier, who have consistently delivered results despite operating in a difficult environment. The team’s proactive approach and excellent communication have ensured that the project is on target to complete on schedule. Their ability to adapt to challenges and deliver results on time has been invaluable.

– Project Manager at Mace

 

Proven results:

The project was successfully delivered to Mace’s satisfaction with minimal disruption to live operations, allowing Mace to

break ground for construction works fully equipped with accurate survey data.

  • Full coverage 3D PAS128 M4P Utility Survey and setting out plans for future construction phases:
    • Utility plans overlaid on CAD drawings, manhole schedules, and comprehensive survey report with control listings and data acquisition details
    • High-quality data outputs integrated directly into Mace’s design workflows
  • Completion on schedule despite operational and logistical challenges

  • Strengthened relationship with Heathrow and Mace, leading to future projects